how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / pritesh .c . bhoi
mix desighn = 1:2:4= 7
quantity is 1 cum add 52% westage and shreankage
so 152 cum
cement = 1*1.52/(7)=0.21714 cum (dry volume)
volume of one bag is 0.0347 cum
so no of bags are 0.21714/0.0347= 6.25 nos say7 numbers
bags are required
sand = 2*1.52/(7)=0.43428 cum
course aggregates = 4*1.52/(7)=0.86857 cum so conclution
is
cement =7 nos bags
sand =0.43428 cum
course aggregates =0.86857 cum
if any mistake please informed . thank you
| Is This Answer Correct ? | 24 Yes | 9 No |
Post New Answer View All Answers
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
what is labour consume factor in residential projects
Water filter calculation formula
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
what motivates you to do a good job
give me the rate analysis for Bituminous Macadam and SDBC
what is the water cement ratio for plastering
Define What is unit weight of normal concrete?
What are the applications of modulus of elasticity?
What is the difference between yeild strength and compressive strength of steel???
For the construction project what capital cost has to be taken in consideration?
What is labor and material payment bond?
what is flexible and rigid footing?
What is change order request?
What is the worlds largest concrete dam?