50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
what is project?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Why should you show Client/Engineer activities clearly on the project plan?
what is shuttering co efficient?
What is GSB gradation
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
what are the Task work of different labour.?
cement and sand required for one block of size 0.23*0.15*0.46
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
how can calculate cutting length of diamond ring
What are some structures that may be subjected to fatigue?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour