Who will change the Bug Status as Deffered?
Answer Posted / tztexas
A deferred defect is a defect that is caused due to a time
constraint and cannot be corrected in the current release
and/or it is due to missing a system requirement and was
never coded or coded correctly. The CCB...Change Control
Board decides if a defect should be deferred. The CCB is
usually comprised of the Project manager, lead/key
developers, and lead/key testers. Sometimes even a key
user or SME (subject matter expert). A developer or tester
alone SHOULD NOT change the status of a defect to deferred.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Test cases on send/ receive button of Microsoft outlook.
what is the architecture of your current project?
How to do integration testing on duster......
What is bug severity?
How can you use technology to solve problem?
Can any one explain me about hybrid integration testing? and what is interface in integration testing? thanks in advance...... regards, MurthySharma.Manchella
What do you understand by usability testing?
What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)
What is remedy testing,expalim that and how can use that
!what are the entry criteria for antomation testing ?
What is early testing?
How can data caching have a negative effect on load testing results?
what are metrics and what are metrics did u collect in you are project
Hi to all, im vaibhav i joined a MNC as a tester and i got a banking (HSBC) project can any one tell me as a fresher what kind of strategy i sholud use to perform better. thanx
What does 100% statement coverage mean?