Why more than one purchase organizations are assigned to
one plant?

Answer Posted / sourabh kumar dass

More than One Purchase Groups makes :
1. Better Inventory Control.
2. Effective Materials management.
3. Responsible Procurement.
4. Areawise Ownership and Availability of Spares.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

reversing of each word in the string

1624


What are the requirements of a good organization?

692


What is autofacturing?

728


What kind of tools and materials are required to test water softening system of heating plant?

1660


what is the need of rectifier?

1362






What you know about iso 9001? What is quality management system? Weather qms is suitable, adequate and effective or not? Is there any quality policy? Is there any quality objective? If yes, then what are they? How they are planning to achieve quality objectives? Do they are measure quality objectives?

779


Difference between chopper and dbr?

756


What is the major difference between Normal control loop and Cascade control loop and when to use cascade control loop?

3025


What is fauit level

1770


How three wire proximity can be used in place of two wire proximity?

670


i gotadmission in southeast missouri state universit ive got scholarship too my gre is 860 and ielts 6.0 bands and B.E 59.3% with 5 backlogs what are chances that i get visa????/

1544


Which two groups of management manages the control organization and what are their responsibilities?

719


What is different between preventive maintenance and maintenance?

651


axial displacements of the turbine. What could be the causes?♪ ♪

1847


if salary paid per month rs. 50000/- of male <65 i will deduct tds from his salary please what i will do explain?

1771