what r the client requirements? when u r running the script
in Vugen?
Answer Posted / thushra
we will get client reqiurements for performence testing
from NFR
I got this answer from Shiva He is loadrunner trainer.
He is giving traing in bangalore.He is providing very good
training we will get job with in short period of time.Even
i got job in one of BIG MNC
Those u r searching for loadrunner training approach him
His contact number 09886372867
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
How can we debug a loadrunner script?
You have created several auto-correlation rules. A new tester on your team is preparing to record a group of scripts on the same application on his workstation. What can you do to provide the tester with the correlation rules?
What is the modular approach of scripting?
What is vuser-init section?
What is the think time? What is the threshold level for think time and how can be this changed?
How many vusers are required for load testing?
What is the benefit of running a vuser script as a thread?
During the load test, what is the optimum setting for logs?
What do you mean by path?
Why vugen is used in lr?
What is ramp up and ramp down?
What should be done to view parameter substitution in the execution log?
What are the types of checkpoints is available in loadrunner?
What is wasted time in vugen replay log?
How to identify what to correlate and what to parameterize?