Answer Posted / bharathish
Production version is a combination of BOM and Master
Recipe..which determines the production method means which
combination of BOM & Routing needs to be selected is
determined by production version...
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is plm (product lifecycle management) in sap pp and what is the use?
What is end user training
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
Define mrp list
How does sap know that an operation has components as indicated by the component allocation indicator?
Control keys
What is primary cost and secondary cost?
What is the transaction code to run MRP for sales order?
what are the constraints of Variant configuration?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is the Difference between TECO and CLSD?
You want to integrate pp with fico. What steps would you take?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
Explain the mrp group and their uses.
list the important tables used in pp.