Answer Posted / mahesh sali
EP PANEL IS NOTHING BUT ESP PANEL ( ELECTROSTATIC
PRECIPITATOR PANEL ) & AHS ( ASH HANDLING SYSTEM PANEL )
THANKING U
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
when will be the iocl interview results ifaced the interview on september 8 th
True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)
What is different type of Electrical curve and how it protects the equipment's while up-normal situation?
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?
Brief working principle of stabilizer,application & safety precautions
Hi guys! Plz help me to answer the following questions. 1. What are the types of transmission line energy losses? 2. Why are the VLF are used some types of services? 3. What frequencies are used for reliable beyond the horizon terrestrial communication without repeaters? 4. To permit selection of 1 out 16 equi-probable, what is the number of bitis required? 5. What is the most common modulation used for telegraphy? 6. What is the multiplexing is used to increase the capacity of the optic fiber? Thanks
what is the standard duration after failure EB power
why ht motors are star connected?
what will happen when the dc supply is given to the capacitor?
What is the difference between voltages or potential difference? And what are they?
How many double suspension hardware fittings are required on a double circuit transmission tower?
Testing procedure of DG alternator stability test
which type of cabel
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
Can we Co-ordinate relay in Load Break switch?