Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is principle of ultrasonic level transmitter?

Answer Posted / hassanelect

The ideal mounting point for the sensor is directly
underneath the silo roof.
The ultrasonic emitter in the sensor is excited electrically
and sends an ultrasonic pulse in the direction of the
surface of the product. The surface partially reflects the
pulse. This echo is detected by the same sensor, now acting
as a directional microphone, and converted back into an
electrical signal.
The time between transmission and reception of the pulse -
the sonic run time - is directly proportional to the
distance between the sensor and the product surface.
The distance D is determined from the velocity of sound c
and the run time t by the formula:
D=C.t/2

Is This Answer Correct ?    17 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?

1685


what is the input of digital counter during the the calibration time?

2376


Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose

2342


What is the difference between working pressure and calibration pressure of a control valve

3122


why is not useing in boiler skin thermocople

5361


How does a single acting, spring return ball valve actually work? Does it require continuous air supply? 

2192


What is instrumentation instrumentation engineering?

1165


In a gas over oil actuator, after the opening/closing of valve, how the gas is vented out? How does the hydraulic/gas circuit function?

1875


any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com

2011


How many types of sensor

1663


Can please tell mi about SIOS, PRM, SERVER, and what is the diference between PIN LAN, PCS LAN,APC Server, and please send the Doc if possible for referance,mail id patil_amit17@yahoo.com

2016


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2215


How we connect a instrument with ground, Give brief explanation with help of diagram?

2143


what about your moleg in pogrees with company

2327


Isometric drawings are generated during _________________ phase of a project

2127