Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why one pin of plug pin is longer than other two? In some
mobile chargers one pin is made not conducting .Why?

Answer Posted / hm

earthing pin is longer bcoz when we put into the socket, 1st
it gets contact with the earthing point so discharges the
charges remaining previously on the equipment if any, and
neutralizes the surface of equipment 1st. then the other two
pins get contact with phase and neutral of socket.

Is This Answer Correct ?    13 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Draw a SLD of HT distribution EB grid up to users Transformer?

6155


what is POTT and PUTT explain?

3255


As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?

3580


what is the need to express current and voltage in rms value? rms value is also called as effective value,what is effective value?

1899


How will polarity test of Dy5 Transformer ?

2213


What are the types of class b amplifier?

1045


how to calculate the step resistance for slipring induction motor,how you deside the no of step for that?

2152


WHAT IS VCB SAFETY

1194


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

1082


excitation limit of an excitor

1987


I need bhel previous year quetion papers for electrical engineering department.I searched but i could not find out

2035


Load transfer in 11kv double busbar switchgear - operation.

1902


Explain cmrr?

1068


how is the connection of a 3 phase ct trivector meter done on a pole mounted transformer

1312


What is transient response?

1076