If there are some errors in goods movements, and less stock
of material consumed, how can i solve that problem in SAP.
Answer Posted / srinath sastry
You may use transaction COGI to correct the goods Movement
errors
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
What is Schedule Margin key. How floats works in scheduling?
How do you integrate HR (employee) with PP?
What is qualification deficiency?
Explain about rough cut planning
What is 'mps' (master production scheduling)?
What is scope of planning?
what do you mean by opening periods
Explain the lsmw and the steps involved in them.
In sap-pp what are the costing parameters?
What is the use of mrp group?
Define mrp list
Explain what happens to plan after it has been converted into production order?
What are the t-codes for creating, changing and summarizing bom?
How costing is affected the pp?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN