WHICH IS BEST INSTRUMENTATION OR ELECTRICAL ENGG?

Answer Posted / mohammed yousuf

Perhaps Instrumentation engineering since its main objective
is to control the parameters apart from electrical and
sometimes, Instrumentation engg are handy in designing and
monitoring a complete plan which EEE cant do... Also,
Instrumentation are the only streams which connect
mechanical engineering to Computer science engineering for
instrument automation

Is This Answer Correct ?    18 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is function of switch, and how is it work, explain with difination

1805


How we connect a instrument with ground, Give brief explanation with help of diagram?

1658


can we create an interrupt in plc through scada?

1901


how pressure transmitter work, what is its principal to measure and how its generate signal. for pressure transmitterinstallation which precautions must be taken ??

1320


i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....

1612






anybody having Qatar Petroleum questions for instrument Technician offshore ....please send me

5568


Give 2 application of quartz crystal used for process parameter measurement.

1586


For what reason would you possibly be compelled to make use of a Smith Predictor. Explain the idea behind the operation of this device.

1508


How does a single acting, spring return ball valve actually work? Does it require continuous air supply? 

1683


Is it ok, to use non-contact type Radar type LT, on a tank that is half circular from the bottom side? If yes the, isn't the waves gonna bent in other directions? 

1726


What is the advantage of using locally fabricated hook ups over Pre fabricated hook ups in process instrumentation?

1596


Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in

1657


What is first echo & echo window in radar type level transmitter?

1283


Instrument QA/Qc what is the project quality plan?conduit inspection RFI. which documents attache with package?

10408


How will you calibrate an Absolute Pr.Transmitter of range 400mmHg absolute ?

1604