Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
| Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
will fix foundation bolts at site with out template is there any procedure?
what is flexible and rigid footing?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
how can i calculate cement in brickwork
Ratio for 4500 psi concrete
Which are the top apps for you civil engineer?
What is need for setting limits?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
For Wet Mix Mecadam design what is Optimum moisture content
how to find quantity of concrete in PCC M15
What is horizon or horizontal mining?
how clculate excavated or backfilling quantity by simpson's rule
what is column foundation
a butt weld is specified by
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.