Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
| Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
what motivates you to do a good job
What ingredients with% found in ppc cement??
What is the snap size in civil and how can we create it?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
PL.tell me about civil engineering questions with answer
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Which is the best book for building construction?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
What is a bearing capacity of soil?
What is different between DI Pipe and CI pipe?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?