Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
| Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
Explain what is the difference between built area and super built up area?
Why should you show Client/Engineer activities clearly on the project plan?
What is modular elasticity?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
What is thumb rule in quantity and cost estimation of a residential building?
What should be the standard roof height like to be?
Where is the worlds longest elevator and how long is it?
Explain what is structural frames or systems?
Explain the various stages of the project planning process in construction?
What is rate of concrete surface rendering work per sqm
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how meny typs of renging rod?