Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is the maximum strength of cub compress strength in one cub testing
at what pressure ply-wood is obtained by gluing wooden sheets
calculate the quantity of water for 1:6 cement mortar
how can we calculate steel value, depending on load
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What is the quantity of cement in mix m20 concrete?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
plz.show development and anchorage length in simple diagram.
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
Howmuch bend to be provide for 200/600 BEEM