can any one explain me the where is the use of plc and scada
Answer Posted / nikunj patel
plc and scada is used for control purpose. it is one type of
controller by using of this we can on/off any equipment.
Here use leader diagram for programing purpose.it is simply
multi switch with individual control. Now a days micro
controller use in place of plc
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Currently what is the highest capacity (MVA) of SPPg generator available in the market?
I WANT TO INSTALL LIGHTING ARRESTOR ABOVE 20 FEET HEIGHT INDUSTRIAL BUILDING. NOW IT WAS 15 FEET HEIGHT HOW MUCH DISTANCE IT WILL COVER & HOW TO CALCULAT THE DISTANCE COVER BY THE ARRESTOR
How to assume answer to electrical questions
how can i find cable size from current rating?
if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value
What are the advantage of free wheeling diode in a full wave rectifier?
Apparent power is expressed as V * I(Conjugate). Why not in V * I ?
On a 3 winding transformer YNynd11, how do you apply REF protection to the Delta tertiary winding that is supplying auxiliaries to a substation?
what is the constructional difference between a power transformer and potentian transformer?
what is draiv work
at which voltage level arcing ground is occurs ??????????
What about electrical Units. discrive in detail
can i connect wavetrap in 2 different phase in EHV line?
Approach of a cooling tower is the difference between temperatures of what factors?
A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.