how is the wastage component in structural steel being
considered while doing the reconcillation for the
fabrication with returning of scrap under 1 meter length
Answer Posted / sandip panda
wastage is considered as 5% in a metric ton.
| Is This Answer Correct ? | 13 Yes | 8 No |
Post New Answer View All Answers
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Trapezoidal section footing calculation of Volume & its Area
what is the 0 value in quantity surveying
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
What is Density of cement, sand & aggregate ?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Doul Bar reinforcement and details of drawing.
how to stop beam concrete between column
What is the cemnent ratio
Why is concrete cube test carried out?
What are the types of slump?
How do you prepare Material Recovery Statement for deduction from contractors bills?