Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which motor gives constant speed?

Answer Posted / dharmendra choudhary

syncronous motor

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can check the resistance of battery contact?

2197


what is metering cum synchronizing panel and how it is used?

4635


What is the name of the winding to which supply is given?

1161


Why collecting electrode of ESP to be earthed

2135


what is mean by restructuring power system?

2056


how to avoid Saturation in C.T?

2111


what is 3rd Harmonics? how it is generated in alternator

9464


Is RTCC panel needs any control supply.

2039


what is the difference between pvc & fiber glass cables

1549


how can i determine the KVA/MVA rating of transformer precisely?? is there any standard test?????

2388


A powerplant has 8 gensets operating in grid parallel mode. In one genset sometimes there is pf variation and kvar variation. The plant operates in pf mode. When this variation is observed the load is stable, voltage is also stable, freq and genset speed is also stable. How will you check the functioning of pf card. What shall be the ideal output vdc of the pfc, from there it is input to AVR?

2311


what happen if the parallel generator phase angle shift by 1 degree in manual mode

2043


What is polar plot?

1163


A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.

2190


How LT megger works ?

2125