How many no of cement bags required to do the concrete with
the proportions 1:1.5:3 for 4inch thickness for 100 sqft?
Answer Posted / wamique
10bag for thk. of slab 4inch
| Is This Answer Correct ? | 13 Yes | 10 No |
Post New Answer View All Answers
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
What is the development length given in pile?
What is meant by engineering drawing?
what is anchorage length,lap length and (dont remember the last one)
In case if concrete box girder bridges how is the number of cells determined?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Define What is the meaning of a blue land surveyors flag?
How does a traffic light signal work ?
What is braced excavation all about?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches