what is meant by velocity & gravity ?what is the difference
between normal liquid flow & gravity liquid flow ?
Answer Posted / p.gopi
the time rate of change of position of a particle in a particular direction is called velocity
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
what could be the production cost of 1 cum of concrete by CP30 plant
How do you convert wind speed into force?
Explain what is structural frames or systems?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
How to do rate analysis for concrete work including shuttering work?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
what is the difference between prime coat and tack coat in road construction
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
What are the main reasons for conducting pull-out tests for soil nails?
How many feet are in 4 square yards?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?