Answer Posted / vipul n patel
as on indian standard rules & electrical phase seqence in red,yello and blue
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
i want bhel placement paper for electrical if anybody having pl send to my id kavitha867@myway.com immediately
why effective resistance should be more than static resistance in transmission line?
Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics
What is the power requirement of tamil nadu for one month?
In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?
How the setting of the vector surge relay shall be calculated when the relay is to be used for Grid islanding application?
why starting current is high and resistance is almost 0 during the starting of motor dc motor...?
The transmission does not have options: a)Partition noise b) Flicker noise c) resistance d) Short noise and reason
Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0
How many types of faults are there in 3 phase power system?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
USE OF 8 WAY PAN ASSEMBLY
1) What are your personal strength? 2) What are your personal areas of improvement? 3) What are your expectations from from a particular job? 4) what are your carrier objectives?
what happen if generator of micro hydro running at only a small percentage of its capacity, as a comparison, if the diesel generator that runs on only a fraction of its capacity there will be a wet stacking