Answer Posted / s.karthik
and
APDRP-Accelerated power development reforms programme
Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
What is the meaning of loop in transformer
Why do we need interlocking in a HT metering or Ring main unit switchgear?
WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?
How can I calculate the Mega watts required to run a plant having many electric motors and other electrical components.
What do you mean by passive circuit elements and why these are called passive?
State angle criterion.
how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)
why cable i burning without tripping. how can protect led street lights
I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?
What is the difference between the impedance percent and impedance voltage ?
Actuality I have at home electrical panel with 220v 50hz, and I want to converter from there to 110v 60hz, to wiring on the half of my house. Also I like to keep another half of my house with the original 220v 50hz. What is the best and safety way to do?
Explain about Leakage Test.
Define unilateral circuit?
What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?
why ahould you show client/engineer activities clearly on the project plan