In site how we can identify one way slab and two way slab?

Answer Posted / anwar

IF THE RATIO OF LONGEST TO SHORTEST SPAN IS LESS THAN 2
THEN IT IS TWO WAY SLAB, TWO WAY SLABS MEANS REINFORCEMENT
IN BOTH DIRECTIONS AND VICE VERSA

Is This Answer Correct ?    126 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please briefly explain calculating or estimating steel quantity for a RCC column?

1448


What is the strength of 1:6:12 mix?

2608


What is the difference between a wood shake and wood shingles?

705


How to find CN by using arcgis 9.3?

1892


why demand factor less then 1 ?

1777






what is called Bulk Density of aggregate?

1444


what is mc arther pile?

1784


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1134


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5615


what is w/c ratio in dry lean concrete for m10 mix design

7994


how much area can be platered by a mason for exterior

1375


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


what are the values of compressieve strenght?

1603


What is the procedure of concealed plumbing in toilets?

1896


What is the different type of slump test indications?

678