what is the diffrence betwen one way salb & two way salb?
Answer Posted / mouna
l/b ratio greater than 2 it is one way slab
l/b ratio less than 2 it is two way slab
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
How much cement,sand,bricks and water needed for 1square metre brick work?
Define What is unit weight of normal concrete?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
how to conversation of all construction material in to brass
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
silt%= silt volume/ silt+sand volume is this right?
Explain the mechanism of cavitations in pipes and drains?
Explain the water bound macadam roag
Define block?
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
How many Sft of Level Plaster per Kg
What are the common ways of demolition?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Specific gravity of cement?