If I recieved Change request then how I can Process further
this request or how to release the request?
Answer Posted / badaripro
According to change request you can config required release
strategy in Development server with classification or
without classification method & do the Unit testing, after
accepetnce of client, you can move to production server with
help of basis consultant with help of Transport request
all the best
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
Explain how is the vendor return processed without a purchase order reference?
Why do we use document types in sap?
What mrp procedures are available in mm-cbp (consumption based planning)?
What is the sequence of determining the vendor : quota arrangement, source list, pir, old po. Arrange them in right sequence.
Can you differentiate between a sto and standard purchase order at a glance? How?
Explain vendor return procedure and its mapping in sap?
Upto what extent we can increase the length of materials master short text.
what is cbp? What is the difference between cbp and mrp?
How to create pr or po by mrp?
If you want to make item ok check boix as default then what will you do?
What if i’m running a much older version?
What are the plant-specific data in material?
What is Replenishment stock ?
What is the purpose of gr/ir account while posting good receipt and invoice verification?
Explain how sd and mm are connected in sap?