Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between Neutral and Earth

Answer Posted / hampanayak

Hi Friends, I will prepering the Bangalore Metro Railway
Corporation Ltd, post of Elactrical Maintenance post,
Please send more imformation about what type of questions
comming in exams.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to find the torque of the single phase synchronous motor by doing an experiment

1932


What do you mean by a phase angel of instrument transformer?

1105


What is the difference between rulling span and wind span of of an Over Head Transmission Line?

2321


EXPLIAN THE IMPORTANCE OF POLY PHASE CIRCUIT.

2165


Why HT 11 KV Slipring Motors are connected in star ?

2217


State magnitude criterion.

1114


Can i use the B-curve MCB instead of C-curve MCB

2023


solor panels arrange some angle,panel is flat fitted energy was produced or not why?

1899


If Dg set load increase 25%, How much increase fuel Consumption (15 kva 2 cylinder DG set)

2252


redundant connection in contactor?

2496


how to calculate transformer load?

2473


What is the RME and explain the full form and what is the RME work?

2833


I AM A ELECTRICAL PANEL BOARD DESIGN ENGINEER.IF I GO ANY INTERVIEW ,TECHNICALLY WHAT ARE QUESTIONS I WILL FACE FROM INTERVIEWER?

12880


I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?

1866


what is (+) and (-) in generator field detector stand for?