What"s mean by water bound macadam road(WBM)?
Answer Posted / hurmaz
water bound macadam is a base course having stone dust
mixed in it, the main difference in base course and water
bound is that basecourse have no stone dust in it , where
as in case of waterbound macadams water proofing is done by
providing a layer of stone dust over a layer of basecourse,
| Is This Answer Correct ? | 156 Yes | 36 No |
Post New Answer View All Answers
What you understand by richter scale?
Test procedure of fly ash bricks as per code ?
procedure for preliminary selection of size of column of 5 storey building
What are the responsibilities of a construction manager?
what would be the design load of R.C.C Cooling tower per cell.?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
plumbing CPVC fitting FTE Brass full form
Define line type?
Explain what is structural frames or systems?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is GSB gradation
What is modular elasticity?
Define What does civil status mean?
What are the skills required to become an architect?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)