Answer Posted / pallisseri narayanan
During any fault in an electrical system, voltage and
frequency will reduce and the generating station will try
to recover through Auotmatic Voltage regulation system and
Speed Governor control. The system disturbance depends upon
the magnitude of fault, area where the fault is occured and
the time taken to trip through protection relays. In the
meantime if we can throw out some non critical loads the
recovery and system normalisation will be fast and the
remaining loads will be on safe. Hence we provide load
shedding arrangement through a frequency relay with
different stages of frequency setting. Non critical loads
will connect to the first stage ( for example if the normal
frequency is 50 HZ the first stage setting can be 49.8HZ,
2nd stage 49.5, third stage 49.2 etc;) then the next
prioriy of loads to 2nd stage and the next to 3rd stage.
The settings are done as per the electrical system study.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
hello! sir i did three year of diploma in electrical (2007- 2010) and now i m a student of electrical engineering. sir can i apply for germany visa for study and part tome work over there?
what rectifiers is and what are the types of rectifiers?
i need mat lab program to find out the transmission line losses,regulation and losses
we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.
what is the minimum (Common factor) insulatin resistance of the following a, 4mm sq wire b, cable from 50 mm sq to 800mm sq
WHY RATING OF VCB NOT LESS THAN 630A
how to find the Motor,s insulation Power?
What is the mmf,rgt and ngt please brief completely
Saving in copper achieved by converting a 2 winding transformer in to an auto transformer is determined by A voltage transformation ratio B load on secondary C quality of core material D size of transformer core
Fantio of tranformer
How can we increase fuel-power ratio of any DG set?
what are factors to be consider to design a HT & LT motor?
i have completed deee and i've (June2012-feb 2015 experience in electrical maintenance in pvt ltd company.company having HT & LT electrical power.how to apply electrical C-license ,NOW I was resigned my job,what are requirements of applying for c-license
What are the advantages and disadvantages of open loop control system?
Define filter?