Is there any difference between product selection and
material deter mination?
Answer Posted / nanda kishore kunisetty
Material determination
Material determination enables the automatic substitution
of materials in sales documents during sales order
processing. For example, during the course of a sales
promotion, the system can, during sales order entry,
automatically substitute a material that has promotional
packaging. A consumer product may have a special wrapper
for, for example, the Christmas season. Using material
determination, the system substitutes the material only
during the specified period.
Product selection
Product selection uses material determination functions to
automatically propose a variety of substitute products
based on your requirements, customer requirements, and
product availability
When you enter a material in a sales order, the system
checks whether you have set up product selection for this
material. If so, it creates a list of possible
alternatives, checking each to determine current stock
availability, and whether the customer would accept it
based on the product attributes.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Plant to plant is handled using mb1b. If stock transfer orders with deliveries are configured, use me27.
Where do you assign text determination procedures for customer master records and for documents?
What is the client-specific data?
Maintaining sales organization (tvko)?
What happens when a value is not entered for a manual and mandatory condition type and does a header condition type have an access sequence?
monitoring Magic Service help desk for issue posted by the end user on daily basis (2) Analy
What is alternative condition type? Give an example?
What is meant by transfer of data from legacy code to sap?
What Time Neede to Upload Master Data and Trasaction Dat From Non SAP Systum to SAP Sys. through LSMW Tool ?
What is the difference between make-to-order production with and without assembly processing?
What is third party order process?
What is rush order?
What is the procedure of Make to order configuration. Plz answer me, Thanks in advance.
Trouble4 shooting , handiling issues with different level of priorties
What is the integrated areas in sd and fi, sd and mm, sd and pp in both implementation and support projects?