Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.Is there any difference between terminologies,HT-HV &LT-
LV?
2.What is the highest transmission voltage level in india?

Answer Posted / jk

HT-HV means HIGH TRANSMISSION-HIGH VOLTAGE (>1000V)
LT-LV means LOW TRANSMISSION-LOW VOLTAGE (<1000V)


The highest transmission voltage in India is 400KV

Is This Answer Correct ?    10 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the specifications we must look at to select a relay for any capacity motor?

2042


sir plz send some previous year questions of jspl.

1940


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1466


what are symmetrical and non symmetrical components in electrical installation.

2082


What are the common sources of energy?

1108


why don't we use the generator as a motor? and what will happen?

1897


Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT? 

1967


Why Ac Systems Are Preferred Over Dc Systems?

1312


What is resistance reading of earth copper rod with grid and without grid?

1155


Why generation voltage in thermal power plant is between 11kv to 33kv?

1035


How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.

2157


What is warm / cold start of HT motors. How many warm start & cold start are possible in a day?

2056


Discuss about gear cutting machines.

1222


Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?

1978


i have applied for the post of RRB section engineering chennai board please send me previou papers and solved answer. my mail id jagarapusrinivas@gmail.com

1980