Which is the IS code Using for Cement Sand Mortar
Answer Posted / dsf
IS-456
| Is This Answer Correct ? | 20 Yes | 18 No |
Post New Answer View All Answers
How to take labor charges for construction of 1cum of concrete?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how much percent are used 20mm,10mm?
how to calculate MR 9(derivation)
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Cement consumption of one cubic meter of aerocon blocks masonry?
how to workable concrete cube test M-25 design mix
Explain major differences between routing maintenance and major maintenance.
how to tie 10 legged stirrups
how much area can be platered by a mason for exterior
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How can we convert weight batch to volume batch for m30 mix
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?