when we connect a ceiling fan to a inverter's output
voltage, it give some noise, why?
Answer Posted / sunil pargania
inverter convert DC in to AC, but not pure AC some DC
component remain left in inverter's output volt. so due to
this DC component fan give the noise.
| Is This Answer Correct ? | 22 Yes | 3 No |
Post New Answer View All Answers
what & how to check the lightning arrester
What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
need to make a report. Need to choose a 3phase induction motor. Load conditions motor will operate in : Maximum Load: 30 Kw Speed: 2950 rpm Ambient temp: 20 cent Supply voltage: 440V Frequency: 50Hz need to look for the safety factor when choosing the motor, went through catalouge found a few, but dont know how to choose the safety factor allowing an extra load something above 30 KW to avoid any harm.
what is metering cum synchronizing panel and how it is used?
Brief me about maintenance planning & sheduling of machine tool.
What is the one main difference between ups & inverter ? And electrical engineering & electronics engineering ?
what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????
a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
What is routh hurwitz stability criterion?
On what cycle does thermal power plant operate?
mccb service sittings be done?
On what basis the the size of Lightning arrester for buildings are selected ?
How to calculate LT XLPE CABLE for 11 kv / 433 v , 1000 kva oil type transformer system?