Answer Posted / m krupa varam
2500Kg/m3
| Is This Answer Correct ? | 26 Yes | 2 No |
Post New Answer View All Answers
What is the crank length in the slab?
what are the Task work of different labour.?
what is castigliano theaorem
what are the duties of Site Engineer in work site?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
For what purpose bedding is used under storm water drains?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
why we are useing plastic under the lean concrete?and whts the advantage?
What you understand by building codes?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
pls mail some more tecnical qustions at msaranya2610@gmail.com
how much need sand and cement for 1 cft roof construction?
Reinforcement details at hinged joint