Answer Posted / indrajeet
In parallel operation the process of removing non cricital
loads during undesirable eventsis called load shadding.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why the standard of ambient teperature mentioned as 40 degree celcius in machines.
what happen when we add mentos in cold drink?& why?
why we are not giving the zone 1 trip command to the master trip relay
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
what is through fault?
WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?
how open delta PT works & what is its construction?
what is gridrotor resistance starter
can anybody tell me that for p.f. Improvment we use capacitor banks but how to decide its capacitance. As we all know how to calculate kvar but what abt capacitance value
What we mean by vintage of an engine+Generator?
Any one can explaination about calibration with rotating sub standards?
how to design the heater in temperature control unit to heat 50KL of water?
what is formula for calculate thermal overload in new numiricalrelay( not in bimetal relay)?
If I have Energy Meter Ratio as 100:5 & Also I have CT Ratio as 50:5 then what will be my multiplying Factor(M.F.)
I have been using an 600VA with 0.6 p.f UPS with my desktop which has 450W power supply unit. Can anyone explain how can this happen . Because the output of the UPS is 360W (600*0.6) (<450W)