Answer Posted / sudhiranjan
V and V stand for
V=Verification
V=Validation
Verification- It is done at application developing stage. It
is process oriented. It is prevention of the bug. ex:
verifying the docs like Srs, proj plan etc.
Validation- It is done at testing phase. It is product
oriented. It is detection of the bug.
Broadly it is called 'V' model in an organisation.
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What is the limit for test steps?It should be 10/20/30etc
What is application programming interface (api)?
i have 2.5 years of experience in manual testing and qtp. can anyone say me what kind of questions do they ask on manual testing and qtp.
14.What is function point breakdown?
3.if a questions asked as,what is the quality standards you are following? what i need to tell.
Can you explain random/monkey testing?
hi every one can you send me ISTQB Course material on my Email id deeptimundra997@gmail.com
Hi, Please can one tell me how to test the usability testing, which method has to be used, how to write the report? Thanks Deepa
Unit Testing can be done by using Nunit?
You have a testing team of 10 members, and now you have to reduce it by 5 member and you dont want to increase risk in your product, you are try to cover all functionality to test. What test Strategy you follow.
What is Cyclometric testing?
What types of documentation are used in qa?
What is test driver and test stub?
could u pls anyone tel me .."which is the best instute that provides eficient practical knowledge and also real-time oriented knowldge to do a project in manual and automation testing..in hyd" pls send me to dis mail-id if u find any..? sinducute17@gmail.com
Can anyone please tell in detail about the Rally tool and how a tester is going to use it.