How to calculate concrete,s cement, sand, metal on the
bases of its ratio. For any volume of work please give me
brief calculation
Answer Posted / dheeraj deshmukh
Mr. Ravsaheb,
The calculation is like below.
1/1+2+4=.142
.142x1.52x(1440/50)=.22
Hence, .22/.035=6.29bag/m3
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
undistributed samples are obtained by
What happens to Load at yielding ?
How many days should curing of plastering, brick work and concrete
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Define What is the tallest man made structure in the world?
For fine aggregate which is most suitable River sand or crusher sand & why ?
what is constat for brickwork
115mm thickness brick work how to required mortar
What is costing in 100squre feet bricks
how to calculate quantity of bricks in circular manhole with examples.
as per is code, what is the minimum content of opc and ppc cement for rcc structure
what is tension column?
why is M30 grade Concrete use for Foothing & Column M50
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar