How to calculate concrete,s cement, sand, metal on the
bases of its ratio. For any volume of work please give me
brief calculation
Answer Posted / dheeraj deshmukh
Mr. Ravsaheb,
The calculation is like below.
1/1+2+4=.142
.142x1.52x(1440/50)=.22
Hence, .22/.035=6.29bag/m3
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
from where ican get sample papers for CET-delhi 2012
How do we determine the specific gravity of a cement?
what is the mix design for M:60 with micro silica andmetakaoline?
How much cement will require for 1Rmt Skirting laying
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
what are RIB slabs explain about it
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What do you mean by tolerance factor of concrete ?
What are the advantages of cad software?
What is factor not to be taken in consideration in mix design?