How to calculate concrete,s cement, sand, metal on the
bases of its ratio. For any volume of work please give me
brief calculation
Answer Posted / dheeraj deshmukh
Mr. Ravsaheb,
The calculation is like below.
1/1+2+4=.142
.142x1.52x(1440/50)=.22
Hence, .22/.035=6.29bag/m3
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
What is semirigid connections?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
What does civil status mean?
what is Bearing Capacity,How to determine it?
How to do bbs in excel format
What is c.g.i sheet which used for roof??
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what are the ffactors you considered choosing the course?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What glue is least sticky?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?