Answer Posted / rajsh potdar
COOIS is Production order information system.It give the
detail information about production order.We can generate
various production report with help of differant option
given in a List and Layout.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is the t-code for changing production order and to display production order?
Question related to Production order status or status profile?
What is the transaction code to run MRP for sales order?
Where have we to specify the teardown time in one operation?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
How to create object dependencies in a bom for a configurable material?
Integration between PP and SD module.
Can't one material be assigned to more than one operation in a routing?
what are Standard keys
Scheduling times can be defined in the material master record by?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
Mention how mrp (material requirement planning) types are classified?
Can't one material be assigned to more than one operation in a routing, why?
Why is work scheduling required for semi finished and finished products?