Answer Posted / suresh
as per is code we keep 38d to 50d otherwise as per drawing
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
from where ican get sample papers for CET-delhi 2012
how do you stabilize a waterlogged area in road construction
What is oneside mat. And explain
Can inverted beams used in pipes during construction?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How to find out slope footing concrete
please send me bhel questions on rupesh.017@rediffmail.com
procedure for preliminary selection of size of column of 5 storey building
Define different types of roof systems?
what is the mode of method of face bar measurement
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
what is tension footing?
What is hybrid foundation?