Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why a motor rating in KW?

Answer Posted / ramya

it depends on power we take for ex... active power,reactive
power

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the capacity of the Fastners 12mm?

2504


how to changeover ups in this power failur time?

2038


what is basic difference betmeen normal & flame proof motor??

2091


why are installed water leakage detection system data centers & server rooms

2462


HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.

2268


pls,send the previous year written test questions.

1958


I have c license but I don't know eligibility of Max Kilo Volts under the electrical licensing board.

1765


What is effect on in zone and out zone fault if CT chosen for phase side is Vk/2<5mA and Neutral side is Vk/2<15mA on REF protection of Transformer

2438


Please explain me abt PQ diagaram in the power sector.

2468


how to synchronize 3 phase slip ring induction motors of different ratings.

2350


Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics

2356


How stabilizer works??

2158


Trafo ratio is 11kV/6.6kv,Vector group is YND11. What will be the effect if secondary is used for earthed system.

3851


How servo stabilizer works.

2164


Q) Write VBscript code along with QTPscript code in QTP tool for below scenario 1. Launch yahoo site(i know) 2. Do loogin(i know) 3.Click inbox link(i know) 4.Go to every page of mail box and count no.of read mails and no.of unread mails(i know) 5.Store page numbers, read mail count and unread mail count in a new excel file sheet 6.Create 10 types of graphs on that data 7.Do logout and close site(i know) 8.Save new excel files with graph

2547