Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is plate load test??

Answer Posted / sjtbehera

Plate load test is carried out in pilling work. After
piling is done it has to tested according to desigin load.
The method for this test is called plate load test. Some
wights ( Generraly Sand Bags) are kept on pile via plate.

Is This Answer Correct ?    15 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to make tiles floor step by step procedure?

1921


how we calculate the vol.of wet concrete..?

1841


How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently

2487


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1755


who to find building iron rod strenth

2107


How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument

2109


What do you mean by honeycomb in concrete?

1167


how to calculate the strength of rebound hammer test reading in building construction ?

3311


How much quantity of rod binding work by a rod binder per day

1435


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4445


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

1363


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2684


I am called for interview from north east power plant .so, I need some interview question which may help me.

1734


Explain what is Hybrid Foundation?

1129


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1891