Answer Posted / sjtbehera
Plate load test is carried out in pilling work. After
piling is done it has to tested according to desigin load.
The method for this test is called plate load test. Some
wights ( Generraly Sand Bags) are kept on pile via plate.
| Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
How to make tiles floor step by step procedure?
how we calculate the vol.of wet concrete..?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
who to find building iron rod strenth
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What do you mean by honeycomb in concrete?
how to calculate the strength of rebound hammer test reading in building construction ?
How much quantity of rod binding work by a rod binder per day
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
I am called for interview from north east power plant .so, I need some interview question which may help me.
Explain what is Hybrid Foundation?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream