Answer Posted / lakshmi potukuchi
To create customer master use XD01 t code.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Name the influencing factors for pricing procedure determination during sales order entry?
What is incompletion log?
What is the difference between make-to-order production with and without assembly processing?
Do you know what’s availability check is?
Explain the interfaces you have worked on?
What is a 'customer-material information record'?
In back order process system follows backward scheduling or forward scheduling? please give ur valuable answers
I created a new info structure and activated update rules for it. What is the best way to transport them into a productive system?
What happens after Post Goods Issue?
hi gurus, i have used variant configuration(a customer ordering a computer diff combination of monitor,cpu,keyboard) this is my scenario. i have taken and assigned(ct04,cl02,mm02) dov(10x11,11x12,12x13),colour(red,brown,grey),price(sdco,vko nd).now those were again assigned in cu01. can u provide solution urgent.
i have one sold to party that sold to party have 1000 ship to party but if create order system should take always 80 number ship to party how can you do this?
What is the procedure to handle reservation process in sap SD?
What is sap sales and distribution?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
Is it possible to work without specifying a pick/pack or loading time for a shipping point?