Answer Posted / ali
In gulf it is 50 years to 60 years only
and in other contries it is 110 to 120 years Depends upon
the climatic conditions
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
When was the first motorway built in england?
what is mc arther pile?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
How much cement and sand required for 9"brick wall per square metre
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What is construction mitigation management?
How to find permissible diagonal tensile stress in reinforced brick work
What is the different type of slump test indications?
How to increase a bearing capacity of soil?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the difference between chamfer and fillet?
Define What is a kip?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com