why we are caling 440 volt 3 phase supply instead of 660
volt 3 phase supply? because each phase as a voltage of 220
volt. if anybody know the answer for my question please
send it to my mail id. thank you.
Answer Posted / chuck rogers
The sum of any 2 phases is 440. This is a rough estimate as
several factors can play on the load side of the circuit.
Between any one wire (phase) and ground can be 207VAC to
277VAC (with no Load). It's that way because the electrons
said so . . . I talked to them last week.
| Is This Answer Correct ? | 6 Yes | 25 No |
Post New Answer View All Answers
i am electrical and elctronics engg passed out in 2009 want to attend for reliance placements.plz send me apttitude ,technical and hr question answers to my mail plz. my mail id-kat.bindas@gmail.com
In electrical what is earth(ground)connection, wht is the importance of it, why it is recomended to maitain below 3VAC between Neutral and earthspecially in PLC used machines?
can we synchronize star system generators with delta system transmission line ? and how ?
Explain using drawings what is reverse PID action w.r.t PID controllers.
What are motor generator sets and explain the different ways the motor generator set can be used ?
What does the term supermesh means?
what happend to DC shunt motor if its field winding insulation becomes slightly weak? will that motor can run on full load or not explain in detail. thanks
what are the protecyion of transformer & generators
Battery is a voltage source? give one example of current source and why?
we have 3.5MVA-11/6KV transformer. how can we calculate earth fault current and NGR calculation?
why Y CONNECTION IS BETTER INTERMS OF EFFICIENCY AND P.F FOR A LAOD LESS THAN 40% AND WHY AFTER DELTA IS BETTER FOR > 40%
what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing
Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response
please send me the L&T Emb. sys. placement papers and entire details of pattren
what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end