U are a civil engineering student?why do u want to enter
into IT industry
Answer Posted / supriya
I think being a civil engineer v must contribute t0 civil engg field and not IT they exist only because we exist. Who constructs lavish and posh buildings for them? Its we royal civil engineers. They will have to sit on roads and do their work rite? But for roads they need us .For each and everything they are dependent on us.The WORLD cannot exist Without US. SO LONG LIVE CIVIL ENGG.
| Is This Answer Correct ? | 20 Yes | 7 No |
Post New Answer View All Answers
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
How is the leaning tower of pisa supported?
what is Short bored pile foundation.
what is column foundation
what is polity
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what is the theoritical percentage of concrete cubes testing per day?
Detection of a beam & a girder areββββ
quantity of material needed for rubble stone masonry for 1:4 and 1:6
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Define What happens to Load at yielding ?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
(Project Management Topic) What are the important criteria in the successful realization of the project?