Answer Posted / bala
Cut Over Process:
When we go for cut over, first of all we need to make sure
that all configuration are in place in production that is
thru the TR's which we have created...
Second, We have to do the manual configuration in
production before we go for cutover.
Third we have to move all the master data and transactional
data to production. Make sure that the sequence of the load
should be in proper. Otherwise it will be big problem while
loading...
Is This Answer Correct ? | 23 Yes | 1 No |
Post New Answer View All Answers
What is dunning procedure? How can it be configured?
How does this impact a business-end user?
What is ean?
Explain credit memo
What are the lot size attributes a material can posses?
What are the month end activities in sap mm?
What are the requirements for an ‘mrp run’?
What information does the subcontracting info records contain?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What if i’m running a much older version?
What is the interaction between sap mm and sap abap consultant and how does they interact?
How is the sto different from the standard po?
How you can create consignment stocks?
Explain what is cbp? What is the difference between cbp and mrp?
What is purpose of zgr based invoice verification in purchase order?