Answer Posted / g.aravinda kumar
it depends upon the texture of stone
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
Define What is the force exerted by the Tacoma narrows bridge?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is rate of concrete surface rendering work per sqm
Explain the various stages of the project planning process in construction?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
what is called the inverd level of mabhole chamber?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is the procedure of wet seiving. n percentage of silt in different type of soil?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How many square meter can mason layout chb per hour
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Describe Briefly The Various Methods Of Concrete Curing?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.