Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS THE SPLICE LENGTH WHEN WELD IN REINFORCEMENT STEEL

Answer Posted / g.aravinda kumar

depending upon the size of reinforcement bar

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

on what basis the partial factor of safety are decided? form the load combinations

2296


detailed calculation of the amount of cement used?

2119


What is the difference between Hinged and pinned in Column ends

5330


What is the significance of cost estimate knowledge for an architect?

1700


What are the responsibilities of a construction manager?

1353


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

2053


Define What is passive earth pressure ?

1281


what is hydrostatic paradox?

2354


what will be price of 1:2:4pcc per kg?

2158


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

2225


what isload waring calculation

2429


how i get all type of short type question answer about civil engg

1761


List out some of the software program that can be useful for architect?

1162


how to do cementicious paint for rcc walls of cw pump house

2071


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr