Is the ratio fixed for M-20,M-25,M-30,M-35....grades of
concrete??
Answer Posted / vetri selvan
No, Depends on Materials ,Design Requirement etcc
| Is This Answer Correct ? | 17 Yes | 7 No |
Post New Answer View All Answers
Process of pcc in wateredug
what is pqc
how i get all type of short type question answer about civil engg
What is the sugested procedure of water purification for public supply?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
silt%= silt volume/ silt+sand volume is this right?
what are the challenges of being a team leader and a supervisor?
difference between fc and fc'?
What you understand by building codes?
Specific gravity of cement?
how much area can be platered by a mason for exterior
Will going from a 3-tap to 6-tap increase water pressure?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
how lap length is increased with increase of Grade of steel?