Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Do you know the overhauling of a motor?

Answer Posted / laxmikant

"¢ Disassemble the fan assembly and remove the motor to the shop for overhaul.

"¢ Disassemble the motors. Thoroughly clean and examine all parts.

"¢ Protect machined surfaces.

"¢ Inspect and dimensionally measure motor components including end bells, frame, shaft, sleeve bearings, keyways, fan and running surfaces for wear, eccentricity and other defects. Submit a condition report with readings and conditions as found.

"¢ Completely strip and clean the armature, field coils and inter-pole coils as applicable.

"¢ Rewind the motor using new wire of the proper size and type as specified by the motor manufacturer or equivalent.

"¢ Perform insulation resistance test, DC High Pot or equal, on newly rewound motor and submit report to owner's engineering representative.

"¢ Replace bearings and grease seals, or sealed bearings as original and lubricate if required.

"¢ Renew all assembly hardware and gaskets on covers and inspection plates

"¢ Reassemble and dynamically balance the rotor and motor assemblies. Owner's on site engineering rep to witness

"¢ Reassemble the motor using new contractor provided; shaft sleeves, gaskets and fasteners, bearings.

"¢ All surfaces of the fan, fan housing and motor frames exterior shall be blasted and painted with two (2) coats of primer and one (1) finish coat

"¢ Upon completion of all repairs, inspection and approval by the owner's engineering rep, return assembly to the ship.

"¢ Reinstall motor assemblies using new fasteners and gaskets as original.

"¢ Reconnect the motor and perform operational test for rotation in presence of owner's engineering representative.

"¢ Test under operational conditions for minimum of one hour after temperatures stabilize. Record current voltage, speed and frame/bearing temperature rise at 15-minute intervals. Submit all reports and prove work satisfactory to the owner's engineering representative.

"¢ All interference's and earlier removals shall be reinstalled.

As the maintenace manager (the "owner's engineering rep" eventually reports to me), I'd like to know if anyone has any suggestions for improving the QA tests in the spec to ensure that we get the motors back in as a "like new" condition as possible. Please include in your responses the reasons why a certain test should be performed. Thanks in advance.

Is This Answer Correct ?    22 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which Class insulation is prefered for the sandwich Busducts ? Why?

2037


What are the commonly used schemes for the bus zone protection?

1068


What are approaches to tackle sedimentation problem of reservoir?

1031


What is true sine wave or pure sine wave inverter?? Is it sine wave or step wave?? If it is step wave, waves with how much step is considered as pure sine wave? Is it possible to produce pure sinewave using power electronics?

1878


Why the symbol of register is "zig zag"

1595


Why ground terminal is used in pot meter 10k ohms

1894


i am completed diploma in ece,and working in ht and lt lines.so is elligible diploma in ece for get electrical C Licence?plse give ur opinion?

1910


A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE

2587


How can we calculate the transformer rating if the load calculated is 1000KW (11Kv Supply)?

1084


How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?

1846


why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.

2148


CAN WE CALCULATE THE NEGATIVE SEQUENCE AND ZERO SEQUENCE REACTANCE OF A GENERATOR USING ONLY ITS RATED VOLTAGE, KW, PF AND SYNCHRONOUS REACTANCE??? IF YES, THEN HOW??

5648


THERMAL CAPACITANCE IS MEASURED IN..................................................

2155


When a single pase capacitor run motor- run on 230vac and Case(1)run with 8 Mfd 250 vac.capacitor , Case( 2) run with 8 Mfd 400vac capacitor. What is difference between both case regarding power ,efficiency etc?

2072


Factory acceptance test. FAT. For 132 kv transmisstion towers what is that meaning and what are the tests commonly companies perform now days.

1823