i want know about capillary type LT transmitter installation. we
can install any location in between to HP and LP leg?
Answer Posted / anish kumaran.r
U should install dpt below the HP side ..Also u can mount anywhere wit some changes in dpt settings,but tat wil not b good one may be errotic
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
How to erection of DCS Panel at site step by step
I need to know steps to Calibration Valve Guard......
What is zero elevation and zero suppression?
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
Q-Explain the different load conditions that will produced different offset which may or may not be acceptable to thhe control function
What is the minimum rating availalbe for weld neck orifice in market?
why we use impulse line of flow transmitter at 45 deg. angle both side of orifice plate.
How to calibrate Field bus transmitter? procedure ?
How flow can be measured with dp?
what is function of switch, and how is it work, explain with difination
How RAL(Rotary air lock)works in cement industry?
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
Pl send the model question paper of mahagenco account officer post
Which is your favourite subject & explain any one topic of it.
Draw a simple circuit for a well head control panel used to protect the well against fire, leak, blockage, ESD, & controls the operation of one downhole & one surface safety valve. Explain the operation and controls