How to get cinema chance?

Answer Posted / ashokdheekonda

i want to become a film maker but i dont know how to
approach pls tellmemy ph no:9640888965 my
e-mail:dheekondaashok28@gmail.com plsssssssssss send me

Is This Answer Correct ?    5 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the uses of layer?

822


what is labour consume factor in residential projects

1949


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

753


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1522


What is the effect of a building collapse?

723






Doul Bar reinforcement and details of drawing.

2027


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4578


What is rate of concrete surface rendering work per sqm

1532


I have an span length 16 ft c/c

1141


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1693


how meny typs of renging rod?

1908


what are the challenges of being a team leader and a supervisor?

3426


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3429


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1637


Which brick is best for construction ,either fly ash or AAC BLOCKS

663