0.35 bags per sq ft for RCC work & 0.45 bags per sq ft
including RCC & Finishing work
| Is This Answer Correct ? | 48 Yes | 11 No |
Post New Answer View All Answers
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What are wooden shingles?
what is Short bored pile foundation.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
dialation means
What is gravity flow?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
What things architect have to take care of before starting any project?
How many axes do cartesian coordinate system has?
how to check and keep control on the wastage of material at site
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
what values & beliefs have guided you in your career path
How will you Engage Labours on Site?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).