cement consumption per square feet in multi storeyed
building
Answer Posted / javed shaikh
0.35 bags per sq ft for RCC work & 0.45 bags per sq ft
including RCC & Finishing work
| Is This Answer Correct ? | 48 Yes | 11 No |
Post New Answer View All Answers
why we are useing plastic under the lean concrete?and whts the advantage?
I am called for interview from north east power plant .so, I need some interview question which may help me.
how can we calculate steel value, depending on load
Basic questions of civil engineering
WHAT DLC DESIGN IN CONSTRUCTION
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Formula of area of crane hook
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Explain what is the release of lien?
Explain what is the difference between built area and super built up area?
How much time Required for PPR pipe network testing
which method is used in semi-rigid connection design??
can you provide a link for manual design of building?
What is a projection line?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?