Answer Posted / gajendra singh
3.14(Pia)/4(d*d*0.00785)
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
what is the water-cement ratio of mix design while 30mpa in 7 days?
what is civil all interview questions
Explain different types of rcc pipes.
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
what is the name of shuttering oil used in oman
What is the meaning of a blue land surveyors flag?
How to calculate woden area in sft and Cft
which formula used for calculate the area of segmental arch?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
How many square meter can a worker/labor demolish a structure per day?
how much one carpenter can doing shuttering of slab in one day
What expenses counted in contingencies and how much it is in related to built-up area of the building.
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?